התקנת מערכת לפי תוכנית

Before we start, we do some preliminary checks …

Feasibility study for the construction of solar systems – design and adaptation of the system on the roof, and the implementation of computerized imaging to ensure that there are no shading that may damage the efficiency and productivity of the system.

Planning the most suitable configuration – for every installation, Solar Performance Engineers prepare detailed and precise engineering specifications, make drawings and plans, examine and approve the fitting of the roof structure to install a solar system. If necessary, engineers recommend additional building reinforcements, determine the location and deployment of the other modules and components in the system, identify potential obstacles, and recommend the most effective way to remove them.

Detailed analysis and planning includes predicting system output.

Installation of the highest standard systems – At the end of the planning and meticulous preparation process, Tachlit Solar is responsible for the installation of the system, the assembly, the equipment of the systems and the electrical components. Project managers monitor all stages of the installation process from start to finish to ensure smooth and successful installation. The work and installation processes are carried out by Tachlit Solar according to the final submission plans.

Full mechanical and electrical installation of the system.

Regular control of the solar system – the control is carried out using the monitoring system, in order to check whether the output produced does indeed correspond to the potential of the system.

Training – The customers are guided to the efficient use of electricity and energy savings in the household sector.

Service – During a fault during the warranty period, the service team is activated to deal with the malfunction and / or notice to the customer.